Construction of transport connection between FGL 104 and 213 (input sided) and FGL 28 (output sided), new connection lines
Scope of work: planning, site supervision, commissioning
Replacement investment of gas pressure regulating and metering station for supply of FGL 40.05 and 46.02, planning of dismantling, consideration of alternative energy concepts within plant concept
Scope of work: planning, site supervision, commissioning
Construction of gas pressure regulating and metering station after decommissioning of UGS Kirchheiligen, securing supply of MOP 25 Systems EGL 447 and MOP 63 Systems EGL 455
Scope of work: planning, site supervision, commissioning
CO2 neutral energy supply via innovative gas pressure regulating and metering station (equipped with vortex tubes) over the course of "Going Green" program
Scope of work: planning, site supervision, coordination of commissioning
Construction of an underground gas storage - consisting of caverns, aboveground facility and compressor station
Scope of work: planning, site supervision, coordination of commissioning
Planning, construction and commissioning of hydrogen metering and infeed plant incl. related line modification for feeding in high-purity hydrogen
Scope of work: planning, construction and site supervision, coordination of commissioning
Section Saxony: modernisation of connection lines, guarantee of sustainable and safe energy supply
Scope of work: general planning and site supervision
Construction of two new gas pipelines incl. construction of two hubs, four valve stations and reconstruction of one hub
Scope of work: planning
Connection line for the direct transport of natural gas between the underground cavern storage "UGS Katharina" and the natural gas pipeline JAGAL
Scope of work: planning, site supervision
Expansion of the compressor capacity of the site with two new centrifugal compressor units with electric drive including dust-liquid separator on the inlet side and gas cooler on the outlet side
Scope of work: planning, site supervision, site management, commissioning
Replacement of two coal-fired dust firing vessels by gas-fired HWK plant with a rated thermal input of approx. 180 MW
Scope of work: planning, site supervision
Turnkey project
Scope of work: planning, procurement, site supervision, commissioning
Capacity expansion on the basis of increasing transport challenges; bidirectional connection to all five pipelines on site
Scope of work: planning, site supervision, coordination of commissioning
Extension by fourth machine unit, integration into existing infrastructure, dismantling of old plants
Scope of work: planning, site supervision, commissioning